Warning: include_once(wpae_api.php): failed to open stream: No such file or directory in C:\wwwroot\chacha.asia\wp-content\plugins\wp-all-export\wp-all-export.php on line 916

Warning: include_once(): Failed opening 'wpae_api.php' for inclusion (include_path='.;C:\php\pear') in C:\wwwroot\chacha.asia\wp-content\plugins\wp-all-export\wp-all-export.php on line 916
Chacha B2B » 71173 Automatic Assembly Line Solution
Generic selectors
Exact matches only
Search in title
Search in content
Search in posts
Search in pages
71173 Automatic Assembly Line Solution

Description

This production line is suitable for the entire process of automatic coding, explosion-proof film welding, pole automatic assembly welding, helium inspection, electrical performance testing, film coating, and automatic cutting; Multiple independent machines are connected to form a whole line, completing the assembly and testing of integrated products.
capacity
25ppm
Material throwing rate
<1%
efficiency
Shutdown time<2%